29th February 2016: Further bathroom installation photographs. Absolutely stunning finish as per usual! Smiling Face!

Full bathroom installation in Little Crosby Full bathroom installation in Little Crosby Full bathroom installation in Little Crosby Full bathroom installation in Little Crosby

27th February 2016: Full bathroom installation in Little Crosby for the Newmans. We'll be putting their boiler in on Monday!

Full bathroom installation in Little Crosby Full bathroom installation in Little Crosby Full bathroom installation in Little Crosby Full bathroom installation in Little Crosby

26th February 2016: One of the flats in Atlantic Point has two cylinders with one supplying the flat next door. Below you'll see a double unvented cylinder installation with one suspended.

Double unvented cylinder installed. Double unvented cylinder installed. Double unvented cylinder installed. Double unvented cylinder installed.

23rd February 2016: Installations completed this week. Cracking effort by the team!

Installations completed in the third week of the project. Installations completed in the third week of the project. Installations completed in the third week of the project. Installations completed in the third week of the project.

20th February 2016: We will be starting works on Prospect Point in 4 weeks. We are looking forward to the project! We are currently hiring! Smiling Face!

18th February 2016: Further unvented cylinders installed!

Boiler replacement in Orange Grove, L8 Liverpool Boiler replacement in Orange Grove, L8 Liverpool Boiler replacement in Orange Grove, L8 Liverpool Boiler replacement in Orange Grove, L8 Liverpool

18th February 2016: Boiler replacement in Orange Grove, L8 completed by the team. Excellent work!

Boiler replacement in Orange Grove, L8 Liverpool Boiler replacement in Orange Grove, L8 Liverpool Boiler replacement in Orange Grove, L8 Liverpool Boiler replacement in Orange Grove, L8 Liverpool

16th February 2016: Further installs at Atlantic Point. We've accidentally created a cupboard for the students as our installations are much smaller and neater!

Atlantic Point installations part of our second week. Atlantic Point installations part of our second week. Atlantic Point installations part of our second week. Atlantic Point installations part of our second week.

12th February 2016: Finishing our first week at Atlantic Point. We will now be ramping up the installations per day. Great start to the project!

Atlantic Point installations end of first week. Atlantic Point installations end of first week. Atlantic Point installations end of first week. Atlantic Point installations end of first week.

11th February 2016: Two boiler installations (and new radiators) completed in Norris Green and Woolton by Peter & John Thumbs Up!

Boiler installation in Norris Green - Worcester boiler fitted Boiler installation in Norris Green - Worcester boiler fitted Boiler fitted in Woolton - Worcester boiler fitted Boiler fitted in Woolton - Worcester boiler fitted

10th February 2016: Full bathroom refurbishment in Menlove Gardens, Mossley Hill. Completed by the usual suspects!

Menlove Gardens, Mossley Hill - Full bath refurbishment Menlove Gardens, Mossley Hill - Full bath refurbishment Menlove Gardens, Mossley Hill - Full bath refurbishment Menlove Gardens, Mossley Hill - Full bath refurbishment

9th February 2016: Today we started the replacement of Atlantic Points unvented cylinders. Our first day went without a hitch with Pancakes being served! Smiling Face!

Atlantic Point Student Accommadation Liverpool - Unvented Cylinder Replacement Atlantic Point Student Accommadation Liverpool - Unvented Cylinder Replacement Atlantic Point Student Accommadation Liverpool - Unvented Cylinder Replacement Atlantic Point Student Accommadation Liverpool - Unvented Cylinder Replacement

1st February 2016: We received further excellent news today. Liberty Living owners of Atlantic Point have commissioned further plumbing/heating improvements to the flats at their sister site, Prospect Point. Excellent start to this year! Thumbs up! Van number 7 is being signed on Saturday!

30th January 2016: We are looking to employ 2 full-time Bathroom Fitters and another Gas Engineer. Please see our employment page.

28th January 2016: Boiler installation in Norris Green completed by John! Also, a unvented cylinder we installed for a tenant of Venmores.

New Ideal boiler installation in Norris Green. New Ideal boiler installation in Norris Green. New Ideal boiler installation in Norris Green. Unvented Cylinder installed for a letting agent!

24th January 2016: A six day full central heating installation completed by two engineers for a property refurbishment. Included new boiler, pipework and radiators throughout the property!

Full central heating installation for a property refurbishment. Full central heating installation for a property refurbishment. Full central heating installation for a property refurbishment. Full central heating installation for a property refurbishment.

22nd January, 2016: Full bathroom supplied and fitted for Mrs. Hart. Another stunning first class finish! We also fitted a new window in the bathroom and we're installing a new boiler for her on Tuesday. Thanks for the cream donuts! Smiling Face!

New bathroom fitted for Mrs. Hart in Norris Green. New bathroom fitted for Mrs. Hart in Norris Green. New bathroom fitted for Mrs. Hart in Norris Green. New bathroom fitted for Mrs. Hart in Norris Green.

10th January, 2016: Old school radiators installed by our plumbers. Busy week ahead - boiler installations, bathrooms and general repairs all week! Thumbs up!

New old school radiator installations in Liverpool New old school radiator installations in Liverpool New old school radiator installations in Liverpool New old school radiator installations in Liverpool

3rd January, 2016: Happy new year! We're back to full action stations tomorrow. We also have a new team member starting soon. We hope to have a prosperous year! Smiling Face!

23rd December, 2015: New Ideal boiler installed in Barton Close. We wish all our staff and customers a merry christmas! Smiling Face!

New Ideal boiler installed in Barton Close. New Ideal boiler installed in Barton Close. New Ideal boiler installed in Barton Close. New Ideal boiler installed in Barton Close.

18th December, 2015: Our website was becoming too slow with all the images. We have moved older photos to the older updates page.

17th December, 2015: Full bathroom renovation completed by the team in Crosby. Included us supplying the fittings too! Smiling Face!

New bathroom installation including tiling, electics, plumbing and general works. New bathroom installation including tiling, electics, plumbing and general works. New bathroom installation including tiling, electics, plumbing and general works. New bathroom installation including tiling, electics, plumbing and general works.

17th December, 2015: Boiler installation ready for the cold weather in Dingle.

Boiler installation completed by the team. Boiler installation completed by the team. Boiler installation completed by the team. Boiler installation completed by the team.

11th December, 2015: New central heating installation by the Gas Engineers and Plumbers. Team effort! Electrician is attending today.

Central heating installation by our Gas Engineers and Plumbers Central heating installation by our Gas Engineers and Plumbers Central heating installation by our Gas Engineers and Plumbers Central heating installation by our Gas Engineers and Plumbers

1st December, 2015: Bathroom works on Gordon Drive for a long time customer Smiling Face!.

New shower cubicle and bath on Gordon Drive. New shower cubicle and bath on Gordon Drive. New shower cubicle and bath on Gordon Drive. New shower cubicle and bath on Gordon Drive.

27th November, 2015: Further first class bathroom renovations completed by ourselves Smiling Face!.

Bathroom renovation for a domestic customer. Bathroom renovation for a domestic customer. Bathroom renovation for a domestic customer. Bathroom renovation for a domestic customer.

24th November, 2015: Boiler replacement in Kensington (Worcester boiler) ready for electrician. This is a student property for a long standing customer. We've almost finished another two bathrooms with photographs coming soon!

New boiler installed in a student property for a landlord. New boiler installed in a student property for a landlord. New boiler installed in a student property for a landlord. New boiler installed in a student property for a landlord.

20th November, 2015: New boiler installation on Knoclaid Road by John. Ready for the electrician to attend and fit a fused spur Smiling Face!! Our plumbers also rectified other minor issues within the property.

New boiler fitted on Knoclaid Road, Liverpool. New boiler fitted on Knoclaid Road, Liverpool. New boiler fitted on Knoclaid Road, Liverpool. New boiler fitted on Knoclaid Road, Liverpool.

18th November, 2015: Boiler swap! We also welcome a new team member, Darren. He will soon be starting for us full-time! Winter is certainly starting to snap now! Smiling Face!

Boiler replacement in Aigburth. Boiler replacement in Aigburth. Boiler replacement in Aigburth. Boiler replacement in Aigburth.

17th November, 2015: Boiler replacement (Ideal) on Ashfield Road.

Boiler replacement on Ashfield Road Boiler replacement on Ashfield Road Boiler replacement on Ashfield Road Boiler replacement on Ashfield Road

15th November, 2015: Boiler installation in Menlove Gardens, Liverpool. Part of a full flat refurbishment by the owner. Ready for a fused spur to be fitted.

Boiler installation in Menlove Gardens. Boiler installation in Menlove Gardens. Boiler installation in Menlove Gardens. Boiler installation in Menlove Gardens.

13th November, 2015: Before and after photographs. Full refurbishment right back to the brick of two bathrooms on Hattons Lane, Childwall. We completed all the works. Absolutely stunning first class finish Thumbs up!. The family are delighted and we're delighted working for them! Our plumbers ended up re-piping the whole room due to poor workmanship of the previous installation.

Full bathroom refurbishment in Hattons Lane, Liverpool Full bathroom refurbishment in Hattons Lane, Liverpool Full bathroom refurbishment in Hattons Lane, Liverpool Full bathroom refurbishment in Hattons Lane, Liverpool

13th November, 2015: Commercial Saniflo installation for a new nursery being refurbished off County Road. Includes the full installation of multiple toilets and basins spread over multiple bathrooms.

Commercial Saniflo installation Commercial Saniflo installation Commercial Saniflo installation Commercial Saniflo installation

9th November, 2015: We are pleased to announce our bathroom design service. We have been trialling this with great success. This allows us to visit your home and design your bathroom in HD quality photographs. We offer this service for £25.00 (inc. VAT). Very few companies offer this service!

Bathroom Design Service in Liverpool Bathroom Design Service in Liverpool Bathroom Design Service in Liverpool Bathroom Design Service in Liverpool

8th November, 2015: Full central heating installation on Coronation Street, Liverpool.

Full central heating installation completed by our team Full central heating installation completed by our team Full central heating installation completed by our team Full central heating installation completed by our team

5th November, 2015: New bathroom for a lovely family in Ryegate Road, Liverpool. We fitted a free standing bath & tap, shower cubicle, toilet, sink and radiator. Photos are stunning as per usual! Smiling Face!.

New bathroom fitted in Ryegate Road for a lovely family! New bathroom fitted in Ryegate Road for a lovely family! New bathroom fitted in Ryegate Road for a lovely family! New bathroom fitted in Ryegate Road for a lovely family!

27th October, 2015: Full central heating system installation by John, Paul and the team! Thumbs up!. Fantastic photographs of two bathrooms almost finished will be coming soon!

Full central heating installation in Boxdale Road, Liverpool Full central heating installation in Boxdale Road, Liverpool Full central heating installation in Boxdale Road, Liverpool Full central heating installation in Boxdale Road, Liverpool

20th October, 2015: Our new power flushing setup in action on a boiler conversion Thumbs up!

Our new power flushing machine in action! Our new power flushing machine in action! Our new power flushing machine in action! Our new power flushing machine in action!

16th October, 2015: Boiler replacement on a third floor in Canning Street. Deployed the triple 18s to reach the flue!

Boiler replacement in Canning Street, Liverpool. Boiler replacement in Canning Street, Liverpool. Boiler replacement in Canning Street, Liverpool. Boiler replacement in Canning Street, Liverpool.

14th October, 2015: Boiler conversion (Baxi DuoTec) completed by John & Paul in Sudbury Road, Crosby. We also repaired the wall in preparation for the boiler being installed. Thumbs up!

Boiler conversion in Crosby, Liverpool. Baxi DuoTec boiler installed perfectly! Boiler conversion in Crosby, Liverpool. Baxi DuoTec boiler installed perfectly! Boiler conversion in Crosby, Liverpool. Baxi DuoTec boiler installed perfectly! Boiler conversion in Crosby, Liverpool. Baxi DuoTec boiler installed perfectly!

13th October, 2015: Bathrooms and multiple installations commencing this week! We are looking to employ two more engineers. Must be Gas Safe. Send in your CVs!

8th October, 2015: Full bathroom renovation from scratch. We provided the whole suite including all electrics, tiling and fitting. We also welcome a new team member Paul Watson! Smiley Face

Full bathroom renovation from scratch. We provided all bathroom fittings and installation. Full bathroom renovation from scratch. We provided all bathroom fittings and installation. Full bathroom renovation from scratch. We provided all bathroom fittings and installation. Full bathroom renovation from scratch. We provided all bathroom fittings and installation.

6th October, 2015: Boiler swap completed by an engineer.

Boiler installation in Dobson Street. Boiler installation in Dobson Street. Boiler installation in Dobson Street. Boiler installation in Dobson Street.

18th September, 2015: Busy day today! James P. a new engineer started today!

17th September, 2015: Two boiler installations completed for clients throughout Liverpool by John.

Boiler swap completed for a client. Boiler swap completed for a client. Boiler installation. Boiler installation.

16th September, 2015: Stunning bathroom completed by the team just off Vauxhall Road!Smiley Face

New bathroom fitted in Liverpool New bathroom fitted in Liverpool New bathroom fitted in Liverpool New bathroom fitted in Liverpool

7th September, 2015: New boiler installation (conversion & gas run) in Bowfield Road by John!

Boiler installation in Bowfield Road, Liverpool. Boiler installation in Bowfield Road, Liverpool. Boiler installation in Bowfield Road, Liverpool. Boiler installation in Bowfield Road, Liverpool.

3rd September, 2015: New boiler installation in Ormskirk completed by John. Also included a power flush throughout the property.

Boiler installation in Ormskirk Boiler installation in Ormskirk Boiler installation in Ormskirk Boiler installation in Ormskirk

2nd September, 2015: Van 6 signed up ready to hit the road! Ready for the boiler repairs in the winter!

New Van 6 all signed up and ready for action! New Van 6 all signed up and ready for action! New Van 6 all signed up and ready for action! New Van 6 all signed up and ready for action!

2nd September, 2015: Boiler installation completed by Peter!

Boiler installation completed by Peter Boiler installation completed by Peter Boiler installation completed by Peter Boiler installation completed by Peter

25th August, 2015: New vans have been purchased today ready to be signed up Smiley Face

24th August, 2015: We have a new member of staff starting today. Lee will be carrying out general works!

17th August, 2015: New boiler installation for a housing association in Liverpool. They provide accommodation to vulnerable adults throughout Merseyside.

New boiler installed for a housing association. New boiler installed for a housing association. New boiler installed for a housing association. New boiler installed for a housing association.

14th August, 2015: Replacement of a boiler in Gordon Drive. Ready for the electrician to install fused spur.

Boiler replacement in Gordon Drive Boiler replacement in Gordon Drive Boiler replacement in Gordon Drive Boiler replacement in Gordon Drive

14th August, 2015: A bathroom refurbishment for a long standing customer in Hunts Cross. Includes all the tiling!

New bathroom refurbishment in Hunts Cross for a long standing customer. New bathroom refurbishment in Hunts Cross for a long standing customer. New bathroom refurbishment in Hunts Cross for a long standing customer. New bathroom refurbishment in Hunts Cross for a long standing customer.

12th August, 2015: Great news today. We have been awarded with the installation of ~5000 carbon monoxide alarms throughout Merseyside Smiley Face. These will aid in keeping the people of Merseyside safe and sound!

12th August, 2015: New boiler conversion completed exceptionally by John.

Boiler conversion for a landlord on Courtland Road Boiler conversion for a landlord on Courtland Road Boiler conversion for a landlord on Courtland Road Boiler conversion for a landlord on Courtland Road

7th August, 2015: New boiler installation on Westminister Road by John.

New boiler installation in Westminister Road. New boiler installation in Westminister Road. New boiler installation in Westminister Road. New boiler installation in Westminister Road.

6th August, 2015: A customer had an ageing system in need of major repairs. We installed a new unvented indirect cylinder to replace their older system. There is one before image and the rest of the new installation.

New Unvented Indirect Cylinder installed. New Unvented Indirect Cylinder installed. New Unvented Indirect Cylinder installed. New Unvented Indirect Cylinder installed.

3rd August, 2015: Full bathroom refurbishment. Including replacing the window and moving the door.

Full bathroom installation in Sydenham Avenue Full bathroom installation in Sydenham Avenue Full bathroom installation in Sydenham Avenue Full bathroom installation in Sydenham Avenue

3rd August, 2015: Conversion for a landlord in Liverpool.

Boiler conversion in Liverpool Boiler conversion in Liverpool Boiler conversion in Liverpool Boiler conversion in Liverpool

31st July, 2015: We now offer a full bathroom design service using A We offer 6-12 months at 0% APR and 24-60 months at 9.9% APR.rtiCAD. This allows us to build a customers desired bathroom in front of them in full HD quality.

28th July, 2015: Small bathroom improvements for a landlord completed by John!

Shower installation in a bathroom above the bath. Shower installation in a bathroom above the bath. Shower installation in a bathroom above the bath. Shower installation in a bathroom above the bath.

27th July, 2015: Two new boilers installed in Liverpool by Neil!

New boiler installations in Liverpool New boiler installations in Liverpool New boiler installations in Liverpool New boiler installations in Liverpool

16th July, 2015: A bathroom refurbishment in Crosby. Just needs painting Smiley Face. You can view the larger images on our bathroom photographs page.

Bathroom refurbishment completed in Crosby Bathroom refurbishment completed in Crosby Bathroom refurbishment completed in Crosby Bathroom refurbishment completed in Crosby

16th July, 2015: A boiler installation completed by Neil in Blenheim Close, Liverpool. Moved the older photos to older updates as page is too long!

Boiler conversion in Blenheim Close, Liverpool Boiler conversion in Blenheim Close, Liverpool Boiler conversion in Blenheim Close, Liverpool Boiler conversion in Blenheim Close, Liverpool

13th July, 2015: We transformed a toilet into a full wet room for a client of ours in the food industry. View bathroom photographs for other examples.

Re-furbishment from a toilet to a wet room Re-furbishment from a toilet to a wet room Re-furbishment from a toilet to a wet room Re-furbishment from a toilet to a wet room

7th July, 2015: Vaillant installed in a clients property by John.

Boiler swap completed by John. Vaillant was installed at this property. Boiler swap completed by John. Vaillant was installed at this property. Boiler swap completed by John. Vaillant was installed at this property. Boiler swap completed by John. Vaillant was installed at this property.

6th July, 2015: We are conducting interviews on the 30th of July. Gas Engineers & Plumbers please send in your CVs!

2nd July, 2015: Bathroom refurbishment in Noonan Close, Liverpool!

Small bathroom re-furishment in Noonan Close Small bathroom re-furishment in Noonan Close Small bathroom re-furishment in Noonan Close Small bathroom re-furishment in Noonan Close

25th June, 2015: New bathroom installation for a client in Wirral Smiley Face

New bathroom installation including a full re-model of the room. New shower tray, toilet and bath. New bathroom installation including a full re-model of the room. New shower tray, toilet and bath. New bathroom installation including a full re-model of the room. New shower tray, toilet and bath. New bathroom installation including a full re-model of the room. New shower tray, toilet and bath.

18th June, 2015: New boiler installation by John. This was a conversion from a back boiler to a combi.

New boiler installation (Back boiler to combi conversion) New boiler installation (Back boiler to combi conversion) New boiler installation (Back boiler to combi conversion) New boiler installation (Back boiler to combi conversion)

17th June, 2015: Bathroom installation finished today for a long time customer completed by Michael!

New bathroom installation. Full removal of the old bathroom suite and installation of new one. All materials from B and Q and Ikea. New bathroom installation. Full removal of the old bathroom suite and installation of new one. All materials from B and Q and Ikea. New bathroom installation. Full removal of the old bathroom suite and installation of new one. All materials from B and Q and Ikea. New bathroom installation. Full removal of the old bathroom suite and installation of new one. All materials from B and Q and Ikea.

17th June, 2015: We are pleased to announce two new engineers we have hired. They will be starting next week Smiley Face

17th June, 2015: Boiler installation finished today by Neil.

Boiler installation for a letting agency. Boiler installation for a letting agency. Boiler installation for a letting agency. Boiler installation for a letting agency.

11th June, 2015: We are conducting interviews for two new engineers on Monday (15th June) and have one available interview position left. Send your CV to our email address! Smiley Face

30th May, 2015: We used our new MagnaCleanse as an extension onto a power flush machine this week. It gives us a much better result when power flushing. Photos of new boiler installation in Harbold Road.

New Magnaclean Power Flush extension New Magnaclean Power Flush extension New boiler installation in Harbord Road, Liverpool New boiler installation in Harbord Road, Liverpool

19th May, 2015: Our bathroom season is starting. Around this time of the year we start receiving an influx of bathroom related work.

13th May, 2015: We moved many of our older updates to here.

12th May, 2015: Boiler installation in Stand Park project

Boiler installation for Stand Park in their new extension built by JFC. Photograph 1 Boiler installation for Stand Park in their new extension built by JFC. Photograph 2 Boiler installation for Stand Park in their new extension built by JFC. Photograph 3 Boiler installation for Stand Park in their new extension built by JFC. Photograph 4

11th May, 2015: JFC have announced a partnership with A. W. Byrne of Liverpool!

29th April, 2015: South Ferry Quay boiler replacement.

Southferry Quay boiler replacement. Photograph 1 Southferry Quay boiler replacement. Photograph 2 Southferry Quay boiler replacement. Photograph 3 Southferry Quay boiler replacement. Photograph 4

28th April, 2015: Vets second boiler replacement in another practice! We're now also on the TrustMark Website.

Adams Vet boiler replacement (2nd Practice), Aintree. Photograph 1 Adams Vet boiler replacement (2nd Practice), Aintree. Photograph 3 Adams Vet boiler replacement (2nd Practice), Aintree. Photograph 4 Adams Vet boiler replacement (2nd Practice), Aintree. Photograph 5

24th April, 2015: Today we officially became TrustMark endorsed to government standards of quality workmanship, customer service and documentation. We passed all our inspections! Boiler swap for a Vets in Aintree. We will be installing another boiler in their other practice on Friday! Smiling Emotion

Adams Vet boiler replacement, Aintree. Photograph 1 Adams Vet boiler replacement, Aintree. Photograph 2 Adams Vet boiler replacement, Aintree. Photograph 3 Adams Vet boiler replacement, Aintree. Photograph 4

17th April, 2015: Installaton for an accommodation. Claire has settled in and Mr. Foott now has his team t-shirts!

Vaillant boiler & Cylinder installation for large accommodation in Liverpool. Photograph 1 Vaillant boiler & Cylinder installation for large accommodation in Liverpool. Photograph 2 Vaillant boiler & Cylinder installation for large accommodation in Liverpool. Photograph 5 Vaillant boiler & Cylinder installation for large accomm0dation in Liverpool. Photograph 4

13th April, 2015: We welcome Claire into the office who will be helping Gemma!

7th April, 2015: Vaillant boiler installation for Venmores by Neil.

Vaillant boiler installation for Venmores, Liverpool. Photograph 1 Vaillant boiler installation for Venmores, Liverpool. Photograph 2 Vaillant boiler installation for Venmores, Liverpool. Photograph 3 Vaillant boiler installation for Venmores, Liverpool. Photograph 4

2nd April, 2015: Baxi installation by John

Baxi boiler installation by John. Photograph 1 Baxi boiler installation by John. Photograph 2 Baxi boiler installation by John. Photograph 3 Baxi boiler installation by John. Photograph 4

30th March, 2015: Final stages of becoming TrustMark endorsed almost complete! Smiling Emotion

26th March, 2015: Two boiler installations by Neil.

Repton Road boiler installation in Liverpool. Complex installation (including under floor heating) completed by Neil. Photograph 3 Complex installation (including under floor heating) completed by Neil. Photograph 9 Complex installation (including under floor heating) completed by Neil. Photograph 10

17th March, 2015: Vaillant installed by Neil for a property refurbishment. Also, photos of another boiler installation part of a full CH installation. A further installation completed for a letting agency.

Boiler installation for a letting agency in Liverpool. Vaillant installed for a refurbishment. Full central heating installation. Full central heating installation.

15th March, 2015: Two more vans signed up over the weekend! Smiling Emotion

Van 5 signed up Van 5 signed up Van 5 signed up Van 5 signed up

10th March, 2015: Boiler installation by John

Boiler swap - Vokera Boiler swap - Vokera Boiler swap - Vokera Boiler swap - Vokera

9th March, 2015: Boiler installation in City Centre.

Boiler installation with a long, diverted flue. Boiler installation with a long, diverted flue. Boiler installation with a long, diverted flue. Boiler installation with a long, diverted flue.

2nd March, 2015: We have a new team member on board, Paul Kelly. Welcome Paul!

1st March, 2015: We had telephone issues yesterday. Our provider had issues which are now resolved. Sorry if you tried to call!

23rd February, 2015: Two more vans all signed up!

Two more of our vans signed up. Two more of our vans signed up. Two more of our vans signed up. Two more of our vans signed up.

18th February, 2015: After an initial boiler installation we completed a second for a medical practice on Rodney Street, Liverpool.

Second boiler installation for a medical practice on Rodney Street. Second boiler installation for a medical practice on Rodney Street. Second boiler installation for a medical practice on Rodney Street. Second boiler installation for a medical practice on Rodney Street.

17th February, 2015: Boiler installation into the loft.

Boiler installation into the loft Boiler installation into the loft Boiler installation into the loft Boiler installation into the loft

9th February, 2015: Today we began the process of becoming TrustMark endorsed to government defined standards of operation.

9th February, 2015: Boiler installation in Kirkby by Neil!

Boiler installation in Kirkby, Liverpool Boiler installation in Kirkby, Liverpool Boiler installation in Kirkby, Liverpool Boiler installation in Kirkby, Liverpool

6th February, 2015: This week we started Legionnaires inspections for Venmores and Bradshaw, Farnham & Lea. Both agencies are way ahead of the competition in this respect and three members of our team passed IOSH Accredited courses to undertake this work.

5th February, 2015: JFC have posted some new photos of an extension they're completing, looking great!

3rd February, 2015: A boiler swap (another had been piped up wrong/poorly) for a medical centre on Rodney Street. Installed by Neil. Today we also had a major incident. It involved 5 McDonald breakfasts, three members of staff and a web of lies mixed with deceit. Also added some photos of new van signing.

Boiler installation on Rodney Street Boiler installation on Rodney Street New van signed up New van signed up

29th January, 2015: A Oso Direct Unvented Hot Water Cylinders installed by Dave (for Venmores). Also added a great testimonial from Rob Johnston to the testimonials page.

Hot water cylinder installed Hot water cylinder installed Hot water cylinder installed Hot water cylinder installed

27th January, 2015: Another two boiler installations completed by our team Smiling Emotion

Two Ideal boiler installations Two Ideal boiler installations Two Ideal boiler installations Two Ideal boiler installations

22nd January, 2015: Boiler installation by Neil. Added some new testimonials too Smiling Emotion.

IDeal Logic installation in Liverpool by Neil IDeal Logic installation in Liverpool by Neil IDeal Logic installation in Liverpool by Neil IDeal Logic installation in Liverpool by Neil

13th January, 2015: ...another boiler replacement by John

IDeal installation in Aigburth House, Liverpool by John IDeal installation in Aigburth House, Liverpool by John IDeal installation in Aigburth House, Liverpool by John IDeal installation in Aigburth House, Liverpool by John

12th January, 2015: Boiler installation by John in Aigburth House. Vokera Excel 25KW. Also added further testimonials!

Vokera installation in Aigburth House, Liverpool by John Vokera installation in Aigburth House, Liverpool by John Vokera installation in Aigburth House, Liverpool by John Vokera installation in Aigburth House, Liverpool by John

2nd January, 2015: Happy new year folks! We are all back after a nice long break (some of us haven’t had a break!!). Two boiler installations by Neil. First is in Fernhill Road and the other is in Monks Way!

29th December, 2014: Merry Christmas! We wish all our customers, staff and their families a prosperous 2015!

17th December, 2014: Boiler swap by John in Burghill Road.

12th December, 2014: Nice installation by the Daves

10th December, 2014: Boiler swap on Ash Grove.

9th December, 2014: We are currently hiring. Please view our employment page.

4th December, 2014: Today we broke our record on completed jobs in a day, well done everyone!

27th November, 2014: Boiler swap on Duke Street.Smiling Emotion

21st November, 2014: Another install in Old Hall Street Smiling Emotion

21st November, 2014: Boiler swap for a landlord in Craig Street.

16th November, 2014: New boiler install for C&D in Bootle.

12th November, 2014: A new central heating installation in Bowood Street, Liverpool.

9th November, 2014: A boiler swap in Anfield for Venmores.

3rd November, 2014: Added six new clients throughout Liverpool.

27th October, 2014: First day of BFL work, here we go with the winter!

24th October, 2014: A tight boiler swap! Smiling Emotion

15th October, 2014: New boiler installed on Scotland Road for Merseylets.

10th October, 2014: New boiler installed in a basement on Orford road.

8th October, 2014: Small bathroom refurbishment for a landlord through Venmores.

1st October, 2014: Added new fireplace fitting photographs.

28th September, 2014: Another boiler swap!

28th August, 2014: We have started to upload photographs of poor workmanship we see throughout Liverpool.

20th August, 2014: We had Gas Inspections today and everything went perfectly! Well done us!

13th August, 2014: New boiler installation by Neil

12th August, 2014: New boiler installation in Stoneycroft. Also added more testimonials.

28th July, 2014: New water heater fitted in L8.

2nd July, 2014: Various boiler replacements throughout the city!

25th June, 2014: New water cylinder in L8, Liverpool

24th June, 2014: Added more testimonials. We also have a new team member, John! Welcome John!

20th June, 2014: New boiler replacements for multiple customers.

Boiler install in Charnley Drive. Boiler install in Charnley Drive. Boiler replace in Stanley Gardens. Boiler replace in Stanley Gardens.

18th June, 2014: New boiler replacement (Vokera) for a client in Aigburth.

Boiler replacement in Aigburth (Vokera 25KW) Boiler replacement in Aigburth (Vokera 25KW) Boiler replacement in Aigburth (Vokera 25KW) Boiler replacement in Aigburth (Vokera 25KW)

29th May, 2014: New boiler installation (Baxi) for a customer in Mossley Hill.

Baxi boiler installation in Mossley Hill Baxi boiler installation in Mossley Hill Baxi boiler installation in Mossley Hill Baxi boiler installation in Mossley Hill

23rd May, 2014: Completed bathroom refurbishment designed by customer and constructed by our team. Mr. Sutton also left us a testimonial

22nd May, 2014: We had some issues with our phone lines yesterday evening. They are now all restored.

20th May, 2014: Added more testimonials from our customers.

9th May, 2014: Two bathroom installation completed by JFC. We completed Plumbing works. These are part of large renovations being completed by JFC.

Plumbing works on two bathrooms as part of renovations in L18 Plumbing works on two bathrooms as part of renovations in L18 Plumbing works on two bathrooms as part of renovations in L18 Plumbing works on two bathrooms as part of renovations in L18

6th May, 2014: A kitchen installation completed by JFC (was completed a while ago). We completed the Gas & Plumbing works

Gas & Plumbing works on a new kitchen Gas & Plumbing works on a new kitchen Gas & Plumbing works on a new kitchen Gas & Plumbing works on a new kitchen

28th April, 2014: Bathroom works completed

New bathroom works in Childwall New bathroom works in Childwall New bathroom works in Childwall New bathroom works in Childwall

27th April, 2014: Further boiler installations for our domestic clients.

Vaillant boiler installation for a domestic customer in liverpool Pipe work on a new baxi duo tec Magnaclean installed on pipe work Baxi installation

17th April, 2014: We have a new engineer on our team, Stephen Foster. He brings decades of experience and commercial plumbing/heating knowledge to our team.

15th April, 2014: Office works have been complete, which resulted in phone calls being dropped. Everything is back in full operation now.

3rd April, 2014: New boiler installations for one our clients.

Boiler replacement for a property let by Venmores Boiler replacement for a property let by Venmores Boiler replacement in another property let by Venmores Boiler replacement in another property let by Venmores

25 March, 2014: Added more clients we have recently completed work for.

13th February, 2014: HomeServe Fined £30.6m by FCA. Another reason to use a local company who actually care.

22nd January, 2014: Check our new power flushing services. We have modern high performance power flushing units available.

2nd January, 2013: Happy new year! We are back to regular operation

27th December, 2013: We have some availability for Saturday 28th December, Monday 30th December & Tuesday 31st December. Contact us for more information. We are back in full action on the 2nd of January 2014.

24th December, 2013: Firstly, Merry Christmas to everyone! All our staff have worked hard this year and all are having a well deserved break. We have no availability until the 2nd of January. Sorry!

20th December, 2013: More great testimonials from more customers. We also have a new team member, Neil. Welcome Neil!

20th February, 2014: New bathroom installation in Liverpool. We aren't sure on why the camera is now shading the photos! Also a new boiler installation.

New bathroom installation showing the new chrome towel radiator. Bathroom installation showing the walk in shower. New sink in bathroom install. Boiler installation - new Vaillant

20th December, 2013: New photographs of general plumbing & heating work. Cylinders, boilers and bathroom modifications.

Cylinder install including wooden stand. New chrome radiator installation. New boiler installation replacing an old install. Bidet installation.

20th December, 2013: Over 40 new photographs of central heating installation & upgrades, boiler replacement and new bathroom installations!

Complex central heating system upgraded. Boiler replacement showing new boiler installed. Complete bathroom installation. Bathroom installation showing toilet and sink.

27th November, 2013: A few photographs of fireplaces we have installed

Fireplace installation 5 Fireplace installation 4 Fireplace installation 2 Fireplace installation 3

14th November, 2013: Added a few more testimonials we receive via email after sending receipts. And brrr! It's getting colder!

30th October, 2013: We have added a new FAQ page which we will update over time.

15th October, 2013: Great testimonial from Mike Culleton of Merseyside Toastmaster & Master of Ceremonies. You can now follow us on Twitter too!

14th October, 2013: Plumbing & Heating work

Boiler installation Water heater installation Radiator installation New heating pump installation

6th October, 2013: Previous customers have wrote us some excellent testimonials on Google Plus. You can view them here. Thanks to those who left us them!

5th September, 2013: New website design!

27th April, 2013: The card machine in our office is now working again!

7th April, 2013: A bathroom we completed to customers specifications. We fitted the bathroom, including all the tiling!

Photo of a bathroom we completed in Liverpool. Showing the electric towel rail Bathroom showing the bath and integrated tiling Bathroom showing the mirror, sink and the shower screen A full view of the bathroom showing the sink, shower screen, bath and fully integrated tiles

27th March, 2013: We have added many Testimonials! This year is going fantastic! We have a new team member too, Michael, who is an excellent engineer. We have also built some new excellent relationships with housing associations and landlords who are providing repeat work.

24th July, 2012: Further photos. An empty shell turned into new bathroom.

A new bathroom showing the before state - an empty shell The new bathroom installed. Including washing hand basin, new shower and toiler in Liverpool Another photo showing the newly installed kitchen Photo showing the new bathroom with the new towel radiator

5th May, 2012: Further photos. A new bathroom installation.

A new bathroom showing new bath Bathroom installation in-built shower Bathroom showing the newly installed wash hand basin and toilet New bathroom showing the mirror and full tiling of the whole room

View Recent Updates...